Navigating the Party Wall Act? We're here to help.

Expert Party Wall surveyors for building owners and adjoining owners. We make the process simple, stress-free, and ensure your project stays on track.

Planning a home extension, loft conversion, or basement? Or has your neighbour notified you about their construction plans? You’ve likely encountered the Party Wall etc. Act 1996. It might seem daunting, but it’s there to protect you and your property.

At Toynbee Associates, we are specialists in the Party Wall Act. We’re not just surveyors; we’re your expert guides through every step of the process. We work with both Building Owners (the party carrying out the work) and Adjoining Owners (the neighbours) to ensure the Act is followed correctly and fairly. Our mission is to provide clear, practical advice and professional, efficient service. We’ll handle the legal notices, the schedules of condition, and the final Party Wall Award, so you can focus on your project with peace of mind.

Why choose us:

  • We’re experts: Our team consists of highly experienced and qualified Party Wall Surveyors.
  • We’re clear communicators: We speak your language, not legal jargon. We’ll make sure you understand everything.
  • We’re proactive: We anticipate and solve problems before they arise, keeping your project on time and on budget.
  • We offer free, no-obligation advice: Got a question? Give us a call. We’re happy to help.

Get in touch today for a FREE consultation. Or, find out more about how we can help you.

Contact
Gemini Generated Image o4qlomo4qlomo4ql

More information about the Party Wall

The Act applies to all kinds of works that affect shared walls or structures, including:

  • Loft conversions

  • Rear or side extensions

  • Basement excavations

  • Structural alterations near or on a boundary

  • Internal works that affect a shared wall

If the works fall under the Act, the building owner must serve formal Party Wall Notices. If the neighbour (known as the Adjoining Owner) disagrees, both sides can appoint surveyors to prepare a legally binding Party Wall Award.

We advise both Building Owners and Adjoining Owners, and we make sure your legal obligations are handled correctly and efficiently.

Before any notifiable work can begin, a Party Wall Notice must be served to all affected neighbours. These notices must be correctly drafted and served in accordance with the Act.

There are three types of notices:

  • Party Structure Notice (minimum two months’ notice)

  • Notice of Adjacent Excavation (minimum one month)

  • Line of Junction Notice (minimum one month)

We prepare and issue these notices on your behalf. If you already have your plans ready, we can often issue them within 24 hours.

If the Adjoining Owner dissents to the notice, or does not reply, this triggers a dispute under the Act. That’s where the Party Wall Award comes in.

A Party Wall Award is a legal document that sets out:

  • What works are permitted

  • How they should be carried out

  • Access rights

  • Protection for both parties

  • How any damage will be assessed and addressed

As your appointed surveyor, we handle the full process including schedules of condition, inspections and serving the final Award. After the work is complete, we re-inspect and agree any damage or compensation, helping to close out the Award properly and fairly.

If you are a Party Wall Surveyor or an Adjoining Owner and need a qualified second opinion, we can help. Our team regularly acts as reviewing engineers in Party Wall matters, providing expert feedback on the proposed structural approach and how it relates to the Act.

We are not just engineers. We are experienced and qualified Party Wall Surveyors, which means we understand exactly what the Act requires, how to interpret technical designs in context, and how to flag risks or oversights early in the process.

We can review:

  • Proposed structural and temporary works

  • Party Wall Notices and their supporting details

  • Basement construction drawings

  • Complex load-bearing changes or underpinning strategies

Our reviews follow the P&T Club’s guidance for reviewing engineers, and we always act independently and professionally. We focus on protecting the interests of both owners and making sure all notifiable works are properly understood and evaluated.

Taking over your building is a big decision, but you do not have to do it alone. We help leaseholders across the country set up and run successful RTM companies.

Our surveyors can confirm whether you qualify, take care of the notices, liaise with the freeholder and make sure the process goes smoothly, ensuring you get reliable support from day one through to handover and beyond.

If you are thinking about Right to Manage, get in touch. We are happy to talk you through your options and help you take back control of your building.

FAQs: Party Wall process

Yes, if your planned work affects a shared wall, boundary or structure, the Party Wall etc. Act 1996 requires that you serve notice to all affected neighbours. Common examples include extensions, loft conversions, basement digs or any excavation close to another property. We can quickly confirm whether your work qualifies and, if so, prepare and serve the correct notices on your behalf.

They can dissent to the notice, but that does not mean they can block your project. It simply means they want a surveyor to act on their behalf to review the plans and make sure their property is protected. This triggers the Party Wall Award process, which is designed to resolve matters fairly and allow work to proceed while managing risk.

Fees vary depending on the type of work, the number of surveyors involved and how complex the project is. Typically, if you are the Building Owner carrying out the works, you will be responsible for reasonable surveyor fees on both sides. We offer fixed-fee quotes where possible and will always explain costs before you commit.

You can serve your own Party Wall Notice, but if it’s done incorrectly, it may be invalid. This could delay your project or open you up to disputes later. Notices must follow a strict format and be served properly. It’s usually best to have a professional surveyor handle the process, especially if you’re dealing with tight timelines or sensitive neighbours.

Notices must be served at least one or two months before work starts, depending on the type. We recommend planning ahead and serving notices as early as possible. This gives everyone time to review the proposal and avoids holding up your construction schedule.

If the Adjoining Owner does not reply within 14 days, they are considered to have “dissented.” You are then required to appoint a Party Wall Surveyor for them. This ensures the process moves forward fairly. It is one of the reasons why having a surveyor manage the timeline is useful — we keep things on track.

This depends on how complex the project is and how responsive everyone is. If notices are consented to quickly, things can move in a matter of weeks. If surveyors are appointed and a Party Wall Award is needed, it typically takes around 4 to 8 weeks from start to finish. We’ll give you realistic timeframes based on your specific project.

If you’re the Adjoining Owner and damage occurs, the Schedule of Condition prepared before the works began will serve as a clear record. The Party Wall Award sets out how damage should be dealt with, including options for repair or compensation. We will reinspect the property after the works and help ensure any issues are resolved properly and fairly.

Condition schedules

Learn more

Building owner

Learn more

Adjoining owner

Learn more

Let's get started

If you would like to speak to a friendly and helpful member of our team, ask questions, discuss option or to help with anything on your mind, please get in touch.

Call +44 (0) 20 7736 7311Contact

Privacy Preference Center